- Extensive experience in the implementation of project solutions for the construction of cable lines for the output of SES power (with a total capacity of more than 200 MW), with a voltage of 10-35 kV.
- Knowledge and use in the work of regulatory and legal documentation, state standards, building codes.
- Negotiations with the customer, equipment supplier, contact with the product manufacturer at the design and construction stage. - Management of the project department consisting of 6 people. Personnel training.

Overview

11
11
years of professional experience
5
5
years of post-secondary education

Work History

Head of the Distribution Network Design Department

KNESS DESIGN
Vinnytsya
10.2015 - Current

1. Project management in the field of alternative energy.
2. Development and implementation of projects for the construction of 10-35 kV transmission lines for the delivery of the generated capacity of renewable energy sources (SPP and wind turbines) to the national grid.


Responsibilities:

- management of a project group consisting of 6 people;
- setting and distribution of project tasks among group members;
- the full cycle of managing the object before handing it over to the customer;
- work with the customer and subcontractors;
- preparation of the technical task;
- drawing up and monitoring compliance with the design work schedule;
control of compliance with the scope and quality of project documentation works;
- timely submission of executive documentation;
- control over the execution and implementation of project works by the appointed project executors;
- ensuring compliance of project decisions and documentation that
is being developed, standards, current industry construction standards and regulatory documents, design tasks, technical conditions, other initial data;
- determination of volumes of initial data for design and solution of technical issues arising during the entire implementation period of objects design , their construction and implementation;

- introduction of the latest equipment and materials, technologies and work methods in projects developed by the department;
- integration of design solutions with design solutions of other subdivisions (parts) of the project;
- determination and decision-making regarding the elimination of all identified deficiencies in the implementation of the project development work process;
- development of a technical and economic comparison of construction options;
- organization of contacts with representatives of manufacturing plants, suppliers of equipment, equipment and materials (and search for new ones) for the purpose of implementation in project solutions;
- elimination of received comments from organizations that carry out approval of project documentation, if such were provided;
- field inspection of design objects;
- organization of project documentation approvals with all interested organizations, local self-government bodies, landowners, etc.;
- participation in the analysis and generalization of the experience of project development and their implementation in construction;
- implementation of the author's supervision over the construction of the designed objects;
- preparation of conclusions and feedback on innovative proposals, market monitoring for the presence of novelties to increase the economic attractiveness of project solutions.

Power Engineer

Building complex "Naberezhny Kvartal"
Vinnytsya
12.2014 - 08.2015

- Connection and commissioning of sections of residential areas.
- Calculation of loads and selection of equipment (protection, accounting and switching devices).
- Installation and operation of electrical installations on the construction site.
- Arrangement of internal and external cabling networks.

Design Engineer

private enterprise "BASIS-CENTER"
Vinnytsya
08.2011 - 10.2014

- Design of power supply systems of industrial and technological facilities: sewage treatment plants, sewage pumping stations, objects of high explosive hazard;
- Management and development of projects for internal power supply of objects with a voltage of 0.4 kV;
- Execution of project documentation of internal power supply networks of the object;
- Selection and work with equipment suppliers;
- Answers to comments during the examination of projects.

Education

Master of Science - Electrical Engineering

Vinnytsia National Technical University
Vinnytsya, Ukraine
09.2006 - 06.2011

Skills

English - intermediate level speaking, reading & wrighting

undefined

Timeline

Head of the Distribution Network Design Department

KNESS DESIGN
10.2015 - Current

Power Engineer

Building complex "Naberezhny Kvartal"
12.2014 - 08.2015

Design Engineer

private enterprise "BASIS-CENTER"
08.2011 - 10.2014

Master of Science - Electrical Engineering

Vinnytsia National Technical University
09.2006 - 06.2011
Valerii DekhtiykProject Manager